Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Warning: Undefined array key "hidden" in /home/udcsacom/public_html/wp-content/plugins/fusion-builder/shortcodes/fusion-gallery.php on line 756

Al-WATANIA PAPER FACTORY

Project Description:

Al-Watania for Industries is member of Sheikh Sulaiman Al-Rajhi endowments with significant profit donated to charity works. WFI has 6 manufacturing subsidiaries that adopted the highest local and international standards and achieved many international quality certificates. Some of WFI subsidiaries existed in 1970s.

Scope of work:

  • Supply and installation of Addressable Fire Alarm Control Panel ” FACP”.
  • Supply and installation of fire alarm functioned repeater panel (AFARP) of guard rooms.
  • Supply and installation of new intelligent Multi-sensor Detector.
  • Supply and installation of Linear smoke Detector with range 100mtr complete.
  • Supply and installation of Transponder 4 input/2 output module to be installed for the beam detector.
  • Supply and installation of interface 1 input/1 output to be installed and connected to firefighting risers, A/C packages, ventilation panel boards. With all required accessories.
  • Supply and installation of power supply ALTRONX SMP5PMCTX220 complete with batteries up to 2 hours with electric circuit from the nearest panel (3*2.25 mm²) inside EMT pipe for each power supply to aspare (10 A) in the nearest panel boards.
  • Supply and installation of Fire alarm break glass “Type” with isolator.
  • Supply and installation of Fire alarm Bell 93 with red flashing light.
  • Supply and installation of outdoor siren 114 dba with sharing lamp.

Project Details

DATE

December 28, 2017

CLIENT

Sheikh Sulaiman Al-Rajhi

PROJECT TYPE

Inductrial

CONTRACTOR

INFINITY Power Solution

LOCATION

JEDDAH – KSA

Project Gallery

Site Live Photos